Stage 3
 
When the Kursk is fully prepared, the lifting cables (each made up of a large number of thinner cables) will be lowered from the pontoon and anchored in the holes in the Kursk using large steel plugs. The plugs have arms that unfold under the beams and the inner skin to provide a firm anchorage. Each of these attachment points will be tested at about twice the necessary force before the submarine is raised.
 
This page contains small images. Click on the image to see an enlarged version.