This coastal protection project for Tendring District Council was awarded to VBA JV Ltd in May 2014. VBA is a consortium comprising VolkerStevin, Boskalis Westminster and Atkins that was established to secure works through the Water and Environmental Management Framework (WEM).

The frontage at Clacton and Holland-on-Sea is located on a south-easterly facing section of the Essex coastline with exposure to the North Sea. The frontage included within the project is approximately 5 kilometres in length, stretching from Clacton Pier at the southern end to Holland on Sea to the north.

Designed by Mott MacDonald, the works comprise:

  • Demolition of the existing groynes
  • Construction of twenty two fishtail rock groynes and one terminal rock groyne
  • Capital beach recharge along the whole frontage
  • New promenade handrailing

The approximate principal quantities were:

  • 300,000 tonnes of rock armour
  • 1,000,000 m³ of beach recharge
Back to top

Emergency response

Call SMIT 24/7 at
+31 10 454 99 11

Help us to help you.
Keep the following information at hand when you contact us in case of an emergency:
Initial info:
What? Where? When?

Type and cause of accident:
Fire – collision - grounding

Known damage:
What is the known damage? Where is it located?

Contact details:
Which contact details can we use at all times?

24/7