Emergency response +31 10 454 99 11

The Master Marine accommodation unit HAVEN required an upgrade for operations at the Johan Sverdrup Field.

The upgrade included the extension of the existing legs from approx. 130 m to 160 m and the replacement of the existing spudcan & add-on tanks by new suction caissons. The main contractor of the project was Lamprell, who fabricated all the new leg sections and suction caissons at their yard in Hamriyah, UAE. After which all materials were transported to Ågotnes, Norway. Boskalis was awarded the Heavy Lift scope with the Asian Hercules III consisting of 20 lifts up to 2,500 t and lifting heights up to 120 m down to 65 m below sea level.

Back to top

Emergency response

Call SMIT 24/7 at
+31 10 454 99 11

Help us to help you.
Keep the following information at hand when you contact us in case of an emergency:
Initial info:
What? Where? When?

Type and cause of accident:
Fire – collision - grounding

Known damage:
What is the known damage? Where is it located?

Contact details:
Which contact details can we use at all times?

24/7